Civil 3D Alignment and Profile Design for Detention Basin Outfalls
Align outfall geometry with hydraulic design to control basin performance through connected objects.
Marcus Thibodeaux
3 stories
Align outfall geometry with hydraulic design to control basin performance through connected objects.
Learn how to establish proper drainage and surface control in parking lot design.
Correct workflow sequence cuts storm drainage design time from 56 hours to 19.